Is it possible to install BlokSeT Dc back to back / Double front ?
We do not recommend the installation of BlokSeT Dc back to back/Double Front.
The forced convection happens in the capacitor column as shown below. The cold air enters from the front side of the switchboard and goes out from the rear. All the capacitors are installed at the rear side and cold air cools the capacitors while flowing towards the rear side grill. Hence, if you install capacitor column back to back / double front, the force convection will be affected.

Secondly, Capacitors are installed in the rear side of the BlokSeT Dc column. It will be difficult to access the capacitors if the installation is back to back / double front. Hence, maintenance will be difficult as the breaker and contactors must be completely disassembled to access the capacitor. So, for any future maintenance, the power supply to the entire column must be shut down and it is huge mechanical work.
The forced convection happens in the capacitor column as shown below. The cold air enters from the front side of the switchboard and goes out from the rear. All the capacitors are installed at the rear side and cold air cools the capacitors while flowing towards the rear side grill. Hence, if you install capacitor column back to back / double front, the force convection will be affected.
Secondly, Capacitors are installed in the rear side of the BlokSeT Dc column. It will be difficult to access the capacitors if the installation is back to back / double front. Hence, maintenance will be difficult as the breaker and contactors must be completely disassembled to access the capacitor. So, for any future maintenance, the power supply to the entire column must be shut down and it is huge mechanical work.
게시 대상: 슈나이더 일렉트릭 Korea


도움이 필요하신가요?
제품 선택기
애플리케이션에 적합한 제품과 액세서리를 빠르고 쉽게 찾을 수 있습니다.
견적 받기
영업 관련하여 온라인으로 문의하시면 전문가가 연락드립니다.
구매처
해당 지역의 가장 가까운 슈나이더 일렉트릭 대리점을 쉽게 찾을 수 있습니다.
지원 센터
한 곳에서 모든 요구 사항에 대한 지원 리소스를 찾아보십시오.