브랜드

Impact-Company-Logo-English Black-01-177x54

슈나이더 일렉트릭 코리아 웹사이트에 방문해 주셔서 감사합니다.

슈나이더 일렉트릭 코리아 웹사이트 방문자 분들 모두 환영합니다.
		
오늘 무엇을 도와드릴까요?
How and when do you reform or trickle charge capacitors on a ATV312 or ATV320 Drive that has been setting in storage for a long time?
Issue:
How and when do you reform or trickle charge capacitors on a ATV312 or ATV320 Drive that has been setting in storage for a long time?

Product Line:
Variable Frequency Drives

Environment:
ATV312, ATV320

Cause:
N/A

Resolution:

If the drive was not connected to mains for an extended period of time, the capacitors must be restored to their full performance before the motor is started.

1- Procedure after a long time storage for the ATV312:
The capacitors after a long time storage can have issues. Following a storage time between 2 and 3 years:
  • Use one AC supply variable connected between L1, L2 and L3
  • Increase AC supply voltage to have:
    • 25% of rated voltage during 30mn
    • 50% of rated voltage during 30mn
    • 75% of rated voltage during 30mn
    • 100% of rated voltage during 30mn​

2- Procedure after a long time storage for the ATV320:
  • Apply mains voltage to the drive for one hour before starting the motor if the drive has not been connected to mains for the following periods of time:
    • 12 months at a maximum storage temperature of +50°C (+122°F)
    • 24 months at a maximum storage temperature of +45°C (+113°F)
    • 36 months at a maximum storage temperature of +40°C (+104°F)
  • Verify that no Run command can be applied before the period of one hour has elapsed.
  • Verify the date of manufacture if the drive is commissioned for the first time and run the specified procedure if the date of manufacture is more than 12 months in the past.

Failure to follow these instructions can result in death, serious injury, or equipment damage.

The above information can be found in the installation manual for the product

ATV312 Installation manual page 30: http://www2.schneider-electric.com/resources/sites/SCHNEIDER_ELECTRIC/content/live/FAQS/285000/FA285590/en_US/ATV312 Installation bbv46391.pdf

ATV320 Installation manual page 96: http://download.schneider-electric.com/files?p_enDocType=User+guide&p_File_Id=6286714202&p_File_Name=ATV320_installation_manual_EN_NVE41289_03.pdf&p_Reference=NVE41289


Keywords:
Trickle charge, capacitors charge

슈나이더 일렉트릭 Korea

자세히 알아보기
제품군
자세히 알아보기
제품군

도움이 필요하신가요?

  • 제품 선택기

    애플리케이션에 적합한 제품과 액세서리를 빠르고 쉽게 찾을 수 있습니다.

  • 견적 받기

    영업 관련하여 온라인으로 문의하시면 전문가가 연락드립니다.

  • 구매처

    해당 지역의 가장 가까운 슈나이더 일렉트릭 대리점을 쉽게 찾을 수 있습니다.

  • 지원 센터

    한 곳에서 모든 요구 사항에 대한 지원 리소스를 찾아보십시오.

  • 제품 문서
  • 소프트웨어 다운로드
  • 제품 선택기
  • 제품 대체 및 교체
  • 지원 및 연락처 센터
  • 영업소 검색
  • 견적 받기
  • 채용
  • 회사 소개
  • 부정 행위 보고
  • 접근성
  • 뉴스룸
  • 투자자
  • Ecostruxure
  • 작업 검색
  • 블로그
  • 개인정보 취급방침
  • 쿠키 공지
  • 사용 약관
  • Change your cookie settings