브랜드

슈나이더 일렉트릭 코리아 웹사이트에 방문해 주셔서 감사합니다.

슈나이더 일렉트릭 코리아 웹사이트 방문자 분들 모두 환영합니다.
		
오늘 무엇을 도와드릴까요?
What is the possibility of using Zone Selectivity Interlocking (ZSI) between upstream (NSX160-250) & downstream (NSX160-250)?
To use the ZSI function between 2 Compact NSX MCCBs; one in the upstream and the other in the downstream, one of them will have to be a Compact NSX400~630 to contain the terminals Z3, Z4 and Z5. These terminals are the ones to which the downstream MCCB should be connected to. Compact NSX100~250 MCCBs do not contain these terminals (Z3, Z4 and Z5) and thus won't be able to perform the ZSI function if placed in the upstream/downstream combinations. Please refer to the attached pages from the Micrologic trip unit user manual (refer to "Extract - Compact NSX - Micrologic 5 or 6 - User manual.pdf"). So to make use of the ZSI function between 2 Compact NSX MCCBs, please make that the upstream breaker is Compact NSX400~630.

슈나이더 일렉트릭 Korea

첨부 파일
Extract - Compact NSX - Micrologic 5 or 6 - User manual.pdf [197.17 KB]
자세히 알아보기
제품군
자세히 알아보기
제품군
  • 제품 문서
  • 소프트웨어 다운로드
  • 제품 선택기
  • 제품 대체 및 교체
  • 지원 및 연락처 센터
  • 영업소 검색
  • 견적 받기
  • 슈나이더 일렉트릭 커뮤니티
  • 채용
  • 회사 소개
  • 부정 행위 보고
  • 접근성
  • 뉴스룸
  • 투자자
  • Ecostruxure
  • 작업 검색
  • 블로그
  • 개인정보 취급방침
  • 쿠키 공지
  • 사용 약관
  • Change your cookie settings