Наши бренды

Impact-Company-Logo-English Black-01-177x54

Добро пожаловать на сайт Schneider Electric

Добро пожаловать на наш сайт.
		
Чем мы можем помочь сегодня?
What is the error meaning "No reply from PLC within Timeout period" in Vijeo Designer HMI ?

Article available in these languages: Японский

This happens if a valid reply has not been received from the PLC within the specified timeout period and the communication packet was retried the defined number of times.
Solution:
- Check the load on the PLC and network. The hardware and communication medium might be too busy to handle further communications. If this is the problem, you can increase the Transmission Speed, increase the Receive Timeout, or edit the project to use more consecutive addresses.
- Check the connections
- Check the cable
- Check the cable path for any magnetic interference
- Check if the PLC device drivers on both the PLC and runtime match
- Check if PLC hardware device is damaged

Schneider Electric Казахстан

Узнайте больше
Линейка:
Узнайте больше
Линейка:

Нужна помощь?

  • Инструмент для подбора продукции

    Быстро и легко находите подходящие продукты и принадлежности для ваших условий применения.

  • Получить коммерческое предложение

    Заполните заявку онлайн, и с вами свяжется наш эксперт.

  • Где купить?

    Легко находите ближайшего к вам дистрибьютора Schneider Electric.

  • Центр поддержки

    Находите ресурсы поддержки для всех ваших потребностей в одном месте.

  • Документация по продукту
  • Загрузка ПО
  • Система подбора продукции
  • Замена продукта
  • Центр справки и связи
  • Найти наши офисы
  • Получить коммерческое предложение
  • Где купить
  • Карьера
  • Сведения о компании
  • Сообщить о нарушении
  • Доступность
  • Отдел новостей
  • Инвесторы
  • EcoStruxure
  • Поиск вакансий
  • Блог
  • Политика конфиденциальности
  • Уведомление об использовании файлов cookie
  • Change your cookie settings