Чем мы можем помочь сегодня?

Nutanix AHV: Prioritized VMs with 0 second Startup Duration are powered on

Issue:
When a UPS critical event is cleared and PowerChute starts powering on VMs, any prioritized VMs with a 0 second Startup Duration are initially skipped and later powered on.

Product Line:
PowerChute Network Shutdown v4.3, v4.4

Environment:
PowerChute Network Shutdown configured with Nutanix Acropolis Hypervisor (AHV) support

Solution:
This issue will be resolved in the PowerChute Network Shutdown 5.x release.

Alternatively, if your PowerChute configuration includes priority groups with a 0 second Startup Duration, you can disable VM Startup in PowerChute and power on VMs manually following a shutdown.

Schneider Electric Казахстан

Узнайте больше
Линейка:
Узнайте больше
Линейка:
  • Документация по продукту
  • Загрузка ПО
  • Система подбора продукции
  • Замена продукта
  • Центр справки и связи
  • Найти наши офисы
  • Получить коммерческое предложение
  • Где купить
  • Сообщество Schneider Electric
  • Карьера
  • Сведения о компании
  • Сообщить о нарушении
  • Доступность
  • Отдел новостей
  • Инвесторы
  • EcoStruxure
  • Поиск вакансий
  • Блог
  • Политика конфиденциальности
  • Уведомление об использовании файлов cookie
  • Change your cookie settings