Can I install 3-phase control relay (RM22T*/RM35T*/RM17T*) to monitor Variable Speed Drive Load (VSD)?Article available in these languages: Японский
NO, it is not recommended to connect 3-phase control relay (RM22T*/RM35T*/RM17T*) to monitor Variable Speed Drive Load (VSD).
Опубликовано для:Schneider Electric Казахстан