M251/M241 What happens to the program (boot application) if there is a power outage and there is no battery (or it expired and it was not replaced)
The battery only works to keep the internal clock running while there's no power in the PLC. It has nothing to do with the project being loaded into the controller.
The boot program is stored in the flash memory, which does not require battery backup; in case of a power outage you won't lose the program.
You can clone the application on an SD Card and have it as a backup just in case you need to put it into a replacement PLC if the PLC happens to be damaged in the future.
If this FAQ did not solve your issue, you can chat with us atchat with usor e-mail us atcustomer.services@se.comto create a case with our Technical Support Team.If you are not located in North America, please contact your local Customer Care Center for assistance:Support | Schneider Electric Global (se.com)
Опубликовано для: Schneider Electric Казахстан


Нужна помощь?
Инструмент для подбора продукции
Быстро и легко находите подходящие продукты и принадлежности для ваших условий применения.
Получить коммерческое предложение
Заполните заявку онлайн, и с вами свяжется наш эксперт.
Где купить?
Легко находите ближайшего к вам дистрибьютора Schneider Electric.
Центр поддержки
Находите ресурсы поддержки для всех ваших потребностей в одном месте.