How can we help you today?

Do the auxiliary CTs monitoring the mains on a Branch Circuit Power Meter (BCPM) need shorting blocks?

Product Line
Branch Circuit Power Monitor (BCPM)

Environment
BCPM Wiring and Installation

Resolution
*Warning:  Installation and maintenance of this device should only be performed by qualified, competent personnel that have appropriate training and experience with high voltage and current devices. Failure to follow the instructions / warnings in the Meter Installation Guide can result in permanent damage to the meter, severe injury or death.

The auxiliary CTs on a BCPM do not require a CT shorting block.
The auxiliary CTs have VOLTAGE secondaries. They must NOT be shorted.

Schneider Electric Macedonia

Discuss this topic with experts

Visit our community and get advice from experts and peers on this topic and more

Explore more

Need help?

Get a Quote

Start your sales enquiry online and an expert will connect with you.

Where to buy?

Easily find the nearest Schneider Electric distributor in your location.

Help Centre

Find support resources for all your needs, in one place.