Issue
A user may want to find the part number and dimensions for the mounting brackets
Product Line
Current Transformers
Environment
Power Monitoring and Metering
Cause
There may be a need for current transformers to be mounted and affixed inside a current transformer cabinet or gutter. Mounting them requires more space but makes the installation cleaner, more orderly, and easier to troubleshoot regarding potential future issues.
Resolution
*Warning: Installation and maintenance of this device should only be performed by qualified, competent personnel that have appropriate training and experience with high voltage and current devices. Failure to follow the instructions / warnings in the Meter Installation Guide can result in permanent damage to the meter, severe injury or death.
The part number for the mounting bracket for the PowerLogic Split Core Current Transformers (SCCT) is 3050EMBK3.
NOTE: this part number comes in sets of three.
The mounting brackets are the same as those used to mount the PowerLogic Energy Meter CT's and Enercept Meter CTs, but will also fit all ratings of the PowerLogic Split Core Current Transformer.
Released for: Schneider Electric Malaysia
Need help?
Product Selector
Quickly and easily find the right products and accessories for your applications.
Get a Quote
Start your sales enquiry online and an expert will connect with you.
Where to buy?
Easily find the nearest Schneider Electric distributor in your location.
Help Centre
Find support resources for all your needs, in one place.