How can we help you today?

Transfer project from PLC failed.: The project in PLC does not contain valid upload information

Article available in these languages:

This message means that the controller doesn't have a valid Upload info in the cpu, this is due to fact that while downloading the project the settings to include to the Upload Info was not selected. This option is under Control expert >>Tools >>Project Settings>>PLC embedded data>>Upload information.
If this option is not enabled while download of project it can not be possible to upload the project from the controller.
Upload information are mandatory to have the possibility to regenerate the source code (STU), if this is not the case Unity loader saves as type .STM when a upload from real plc is performed. There is no possibility to manage .stm file type, it is auto managed when you connect Unity loader to a real plc + Upload Info Invalid.
To solve this issue you must have the source application & re-download the code using this option selected.

Schneider Electric Nigeria

Discuss this topic with experts

Visit our Community for first-hand insights from experts and peers on this topic and more.

Explore more

Need help?

Product Selector

Quickly and easily find the right products and accessories for your applications.

Get a Quote

Start your sales enquiry online and an expert will connect with you.

Where to buy?

Easily find the nearest Schneider Electric distributor in your location.

Help Centre

Find support resources for all your needs, in one place.