No, there are no factory commands to power cycle an ION 7700 using telnet or hyperterminal. The meter can only be powered down (or power cycled) locally at the meter.
Released for:Schneider Electric Thailand


{}
No, there are no factory commands to power cycle an ION 7700 using telnet or hyperterminal. The meter can only be powered down (or power cycled) locally at the meter.