Issue:
Shutting down the Symmetra PX 250-500 UPS and transitioning critical load to maintenance bypass
Product line:
Symmetra PX 250-500
Environment:
All Product models, all serial numbers
Cause:
Shutdown Support
Resolution:
Begin at the home screen of the UPS.
Select the wrench key at the lower left of the screen.
Select the 'Operation' button
Select 'System Shutdown'
Follow the step by step outline for shutting down the UPS. After each step is completed the option will be grayed out. Some steps will automatically be completed for you.
The following video demonstrates this procedure:
Shutting down the Symmetra PX 250-500 UPS and transitioning critical load to maintenance bypass
Product line:
Symmetra PX 250-500
Environment:
All Product models, all serial numbers
Cause:
Shutdown Support
Resolution:
Begin at the home screen of the UPS.
Select the wrench key at the lower left of the screen.
Select the 'Operation' button
Select 'System Shutdown'
Follow the step by step outline for shutting down the UPS. After each step is completed the option will be grayed out. Some steps will automatically be completed for you.
The following video demonstrates this procedure:
Released for: Schneider Electric Vietnam


Need help?
Product Selector
Quickly and easily find the right products and accessories for your applications.
Get a Quote
Start your sales enquiry online and an expert will connect with you.
Where to buy?
Easily find the nearest Schneider Electric distributor in your location.
Help Centre
Find support resources for all your needs, in one place.