En quoi pouvons-nous vous aider aujourd'hui ?
EcoStruxure Process Expert: How to remove the warning in simulation control project
This Knowledge base explains the steps to be followed for resolving the warning message popups when the control project is build in simulation mode(when station node is assigned in executable)
The user will be getting the below warning message when he performs the same.
The issue is happening as the ethernet security of EIO bus was not configured as per the requirement.The following steps are needed to be performed to unlock the security of EIO bus in the project
1. Refine the Build project
2. Navigate to the EIO bus configuration as shown below
3. Navigate to the "Security" tab and click on "Unlock Security"
4. Save the refine changes
5. Build the project again.
Publié pour: Schneider Electric Belgium
En savoir plus
Gamme :
En savoir plus
Gamme :
Besoin d'aide ?
Sélectionnez le bon produit
Trouvez rapidement et facilement les produits et accessoires adaptés à vos applications.
Obtenir un devis
Effectuez une demande de renseignements en ligne et un expert vous contactera.
Où acheter ?
Trouvez facilement le distributeur Schneider Electric local le plus proche.
Centre d'aide
Trouvez des ressources de support pour tous vos besoins, en un seul endroit.