{}

Nos marques

Bienvenue sur le site Web de Schneider Electric

Bienvenue sur notre site Web.
En quoi pouvons-nous vous aider aujourd'hui ?
Ecostruxure Automation Expert [22.0]: How to set M580 controller to automatically Run after deployment
This document explains user on how to set M580 controller to automatically Run after deployment.

By default, the M580 Controller will be in STOP mode after successful project deployment and User needs to manually RUN the Controller by giving another Command.

However, User can set the Controller to automatically RUN after Deployment. This can be done by setting the below shown Device configuration settings in Logical devices tab.

deploy

Schneider Electric Belgium

En savoir plus
Gamme :
Articles utiles
En savoir plus
Gamme :