No, there are no factory commands to power cycle an ION 7700 using telnet or hyperterminal. The meter can only be powered down (or power cycled) locally at the meter.
Gepubliceerd voor:Schneider Electric Belgium


{}
No, there are no factory commands to power cycle an ION 7700 using telnet or hyperterminal. The meter can only be powered down (or power cycled) locally at the meter.