How do we know the clone operation process to create a SD card image is completed with M241/M251 PLCs ?
When starting the clone process (powering ON the PLC with an empty SD card inside) the green LED SD is fast flashing ,but as it’s flashing very fast.
At the end of the process, the SD LED change state to stay fix ON until we remove the SD card. But as the eyes can’t really distinguish the differencefor the light emmitted by the LED between fast flashing and steay On , we can’t really not see some difference between the two status ‘clone in progress’ and ‘clone operation completed’
Then to be sure the process ended correctly, it’s recommended:
- to wait up to really 5 minutes after the PLC is PoweredON
- check afterwords, the content of the SD card , by plugging into some SDcard reader, to check the file named SCRIPT.CMD is present into the directory name /sys/cmd of the SD card ( this is the last action achieved by the system during the clone procedure)
Gepubliceerd voor: Schneider Electric Belgium




Hulp nodig?
Selecteer zelf het juiste product
Vind snel en eenvoudig de juiste producten en toebehoren voor uw toepassingen.
Offerte aanvragen
Dien uw aanvraag online in en een expert zal contact met u opnemen.
Verkooppunten
Vind eenvoudig de dichtstbijzijnde distributeur van Schneider Electric op uw locatie.
Help Center
Vind de antwoorden die u nodig heeft via bladeren door veelgestelde vragen over onderwerpen.