M251/M241 What happens to the program (boot application) if there is a power outage and there is no battery (or it expired and it was not replaced)
The battery only works to keep the internal clock running while there's no power in the PLC. It has nothing to do with the project being loaded into the controller.
The boot program is stored in the flash memory, which does not require battery backup; in case of a power outage you won't lose the program.
You can clone the application on an SD Card and have it as a backup just in case you need to put it into a replacement PLC if the PLC happens to be damaged in the future.
Gepubliceerd voor: Schneider Electric Belgium


Hulp nodig?
Selecteer zelf het juiste product
Vind snel en eenvoudig de juiste producten en toebehoren voor uw toepassingen.
Offerte aanvragen
Dien uw aanvraag online in en een expert zal contact met u opnemen.
Verkooppunten
Vind eenvoudig de dichtstbijzijnde distributeur van Schneider Electric op uw locatie.
Help Center
Vind de antwoorden die u nodig heeft via bladeren door veelgestelde vragen over onderwerpen.