Why does Control Expert display a CPU load 90% when the PLC is configured in Cyclic mode?

Issue:

Starting with Control Expert V16.4, a CPU load indicator is displayed in the status bar when connected to a PLC. When the MAST task is configured in Cyclic mode, the CPU load indicator is displayed in orange at 90%, even for a simple or empty application. This behavior may be interpreted as a controller overload, although it is expected.

Environnement:

  • Control Expert V16.4 and later
  • PLC configured with a Cyclic MAST task

Resolution:

This behavior is expected and does not indicate a controller overload.
The CPU load indicator displayed in the Control Expert status bar reflects the value of%SW116 (Total System CPU Load). When the MAST task is configured in Cyclic mode, the controller continuously executes the application without any idle time between scans. Consequently,%SW116 reports a CPU load of approximately 90%, even for simple or empty applications.

This behavior is by design and has been confirmed by R&D. Therefore, a CPU load indication of approximately 90% in Cyclic mode should not be interpreted as a performance issue or a lack of available controller resources.
In Periodic mode, the CPU load is generally more representative of the actual processing margin because task execution is based on a configured period.

Schneider Electric Belgium

Ontdek meer

Productfamilie

Ontdek meer

Productfamilie

Hulp nodig?

Selecteer zelf het juiste product

Vind snel en eenvoudig de juiste producten en toebehoren voor uw toepassingen.

Offerte aanvragen

Dien uw aanvraag online in en een expert zal contact met u opnemen.

Verkooppunten

Vind eenvoudig de dichtstbijzijnde distributeur van Schneider Electric op uw locatie.

Help Center

Vind de antwoorden die u nodig heeft via bladeren door veelgestelde vragen over onderwerpen.