{}

Our Brands

Impact-Company-Logo-English Black-01-177x54

Welcome to the Schneider Electric Website

Welcome to our website.
How can we help you today?
What if I get a same-phase installation error message during installation of the Schneider Energy Monitor?

If you are installing a Schneider Energy Monitor and you've received this error, the monitor is asking you to reconsider the placement of the red and black power wires. Each power wire is sitting on the same phase (or leg) of the panel. The main reason that we ask you to install it on a 240V/dual-pole breaker is to better ensure that the two wires are placed on both phases of the panel. Avoid 120V or single-pole tandem breakers as each slot is powered by the same phase of the panel.

Although the Schneider Energy Monitor unit only draws about 4 watts, or less than 1 Amp, it still needs to monitor the voltage across both phases (A & B) of the panel. For that reason, we always recommend installing it on the smallest 240V/dual-pole breaker available.

If you are installing it in a single-phase (not split) panel, then this result would be expected. Please indicate this on the Phase type page of the Smart Panel Setup app.

Schneider Electric Canada

Explore more
Product:
Users group

Discuss this topic with experts

Visit our Community for first-hand insights from experts and peers on this topic and more.
Explore more
Product: