Nestlé Nescafé: Customer Story Key Figures
Three stoppages avoided since EcoStruxure implementation
Nestlé engineers received a dozen alerts so far, protecting production
Maintenance moved from annual to biannual schedule, boosting productivity
The Challenge
• Digitalize existing power infrastructure for better operational visibility
• Eliminate power disruptions, which can cost Nestlé $52K hourly
• Ensure electrical equipment operates reliably in harsh conditions
The Solution
Apps, Analytics & Services: EcoStruxure Asset Advisor
Connected Products: Trihal transformers, QDLogic low-voltage switchboards, LV Prisma Panels, RM6 MV switchboard, Easergy™ sensors
The Results
• Remote monitoring allows for predictive maintenance
• Improved visibility into power usage
• Open, interoperable platform enables for future-proof scalability