How to install Accusine PCS+ CT's for a Main-Tie-Main Installation
Issue
Example drawings for how to connect CT's for a Main-Tie-Main AccuSine PCS+ installation are not shown in the wiring diagrams in the installation guide.
Product Line
AccuSine PCS+
Resolution
Attached is an example wiring diagram showing the placement and polarity of the CT's for a Main-Tie-Main installation. The polarity of the CT's on either side of the tie-breaker must be opposite the polarity of the CT's after the main breaker on each side. This will allow each AccuSine to correct only the side it is installed on.