How to online Install a Brand-New M580 CPU in a hot standby system
When installing a brand-new CPU during the production operation of the system,
-do not connect the network cable between the master and standby CPUs.
After the CPU and CRA are all fully operational, connect the network cable to construct the ring network.
-Alternatively, in accordance with the operating procedure outlined in the user manual,
you can first download the program to the brand-new CPU independently, then integrate the CPU into the on-site control system.
Udgivet til: Schneider Electric Danmark
Brug for hjælp?
Produktvælger
Find hurtigt og nemt de rette produkter og det rette tilbehør til dine anvendelser.
Få et tilbud
Start din salgsforespørgsel online, så vil du blive kontaktet af en ekspert.
Find forhandler
Find den nærmeste Schneider Electric-distributør.
Hjælpecenter
Find supportressourcer til alle dine behov på ét sted.