המותגים שלנו

Impact-Company-Logo-English Black-01-177x54

ברוכים הבאים לאתר האינטרנט של שניידר אלקטריק

ברוכים הבאים לאתר שלנו.
		
איך נוכל לעזור לך היום?
In Star-Delta starter with type 1 & type 2 coordination, which is the mounting position of OLR? Should it be after the line contactor (OR) Before Line+Star/Delta connection?
Star-Delta Type 2 coordination: The thermal overload relay should be placed in the Main power supply line before the splitting for star-delta connection.

Star-Delta Type 1 coordination: The thermal overload relay is placed in the Delta circuit.

For the Type 2 coordination the thermal overload relay selection is based on the Full load current rating and selection for type 1 coordination is based on Full load current / Sqrt 3 (FLC/1.732).

The schemes published on the Catalog for Star-delta are for the Type 1 coordination only and there is no scheme available for Type 2 coordination in the catalog.

Please find in attachment scheme for the mounting position of OLR for Type 1 & 2 coordination with Star-delta starter.

שניידר אלקטריק ישראל

קבצים מצורפים
Star-Delta OLR mounting position.pdf [33.44 KB]
גלה עוד
טווח:
סיווג:
גלה עוד
טווח:
סיווג:

זקוק לעזרה?

  • בורר מוצרים

    חפשו ברשת של מפיצים מאומתים עם יותר מ-15,000 שקעי למכירה ברחבי העולם.

  • קבלת הצעת מחיר

    התחילו את בקשת הקניה בצורה מקוונת ונציג מכירות ייצור עמכם קשר.

  • היכן לקנות?

    אתר בקלות את מפיץ Schneider Electric הקרוב ביותר אליך.

  • מרכז העזרה

    חפשו משאבי תמיכה לכל הצרכים שלכם במקום אחד.

  • תיעוד מוצרים
  • בורר המוצר
  • מוצרים חלופיים והחלפה
  • מרכז עזרה ויצירת קשר
  • איתור סניפי שניידר אלקטריק
  • היכן לקנות
  • משרות
  • פרופיל חברה
  • דיווח על התנהגות בלתי הולמת
  • נגישות
  • חדר חדשות
  • משקיעים
  • EcoStruxure
  • חיפוש משימה
  • בלוג
  • מדיניות שמירה על פרטיות
  • הודעה על קובצי Cookie
  • תנאי שימוש
  • Change your cookie settings