Can I add a delay in a script action in Vijeo Designer V6.2
There is no delay script method in Vijeo Designer. It is not recommended to create a loop as a workaround since it can make the HMI very slow and effect the communication or even lock up the HMI
If you are calling the script from a switch , you can split your script in half and add a delay operation. This delay operation is only available from a switch operation. So if the script is called from a local or global action it cannot be done.
If this FAQ did not solve your issue, you can chat with us at chat with us or e-mail us at customer.services@se.com to create a case with our Technical Support Team.
If you are not located in North America, please contact your local Customer Care Center for assistance:
Support | Schneider Electric Global (se.com)
If you are calling the script from a switch , you can split your script in half and add a delay operation. This delay operation is only available from a switch operation. So if the script is called from a local or global action it cannot be done.
If this FAQ did not solve your issue, you can chat with us at chat with us or e-mail us at customer.services@se.com to create a case with our Technical Support Team.
If you are not located in North America, please contact your local Customer Care Center for assistance:
Support | Schneider Electric Global (se.com)
פורסם עבור: שניידר אלקטריק ישראל


זקוק לעזרה?
בורר מוצרים
חפשו ברשת מפיצים מאומתים עם יותר מ-15,000 נקודות מכירה ברחבי העולם.
קבלת הצעת מחיר
התחילו את בקשת הקניה בצורה מקוונת ונציג מכירות ייצור עמכם קשר.
היכן לקנות?
אתר בקלות את מפיץ Schneider Electric הקרוב ביותר אליך.
מרכז העזרה
חפשו משאבי תמיכה לכל הצרכים שלכם במקום אחד.