איך נוכל לעזור לך היום?
Can we see how much CPU load is there on M241/M251/M262?
Yes, there is a way to return the CPU processor load using a Library called CmpSchedule.
In the Libraries->Add Library dialog, you will find it under Company->System under System->SysLibs:

The function in the library that returns processor load is SchedGetProcessorLoad:

An example of the program is as follows in Structured Text:
Declaration:
Code:
Note:
In the Libraries->Add Library dialog, you will find it under Company->System under System->SysLibs:
The function in the library that returns processor load is SchedGetProcessorLoad:
An example of the program is as follows in Structured Text:
Declaration:
VAR
pResult1 : RTS_IEC_RESULT; //required pointer to the internal data location type (variable name is arbitrary)
processorLoad : UDINT; //CPU load percentage
END_VARCode:
processorLoad := SchedGetProcessorLoad(pResult:=ADR(pResult1));Note:
- The value returned in "processorLoad" in his example is is a percentage (in UDINT format).
- It is recommended that processorLoad should remain lower than 70% (the lower the better). If this is not the case, then increase cycle times.
פורסם עבור: שניידר אלקטריק ישראל
גלה עוד
טווח:
גלה עוד
טווח:
זקוק לעזרה?
בורר מוצרים
חפשו ברשת מפיצים מאומתים עם יותר מ-15,000 נקודות מכירה ברחבי העולם.
קבלת הצעת מחיר
התחילו את בקשת הקניה בצורה מקוונת ונציג מכירות ייצור עמכם קשר.
היכן לקנות?
אתר בקלות את מפיץ Schneider Electric הקרוב ביותר אליך.
מרכז העזרה
חפשו משאבי תמיכה לכל הצרכים שלכם במקום אחד.