How are capacitor banks wired for a Main Tie Main installation?

Issue:
A customer has a Main Tie Main system and needs to know how the capacitor banks are wired to properly correct power factor for this type of setup.

Product Line:
Powerlogic PFC

Resolution:
Below is an example of how the CT's should be wired for a Main Tie Main installation.  Each capacitor bank will need to have (2) CT's.  One CT will be right after the main incoming breaker with X1 facing the main breaker.  The second CT will be right before the tie breaker with X1 facing the tie breaker.  The CT for the tie breaker is necessary so the capacitor bank can correctly monitor energy coming from the second main through the tie breaker when it is closed. It is very important to make sure the polarities of these CT's are correct for each capacitor bank or else the unit may not correct each side properly.  The CT for the Main and CT for the Tie will have opposite polarity.

Main Tie Main Installation

שניידר אלקטריק ישראל

גלה עוד
טווח:
גלה עוד
טווח:

זקוק לעזרה?

זקוק לעזרה?

בורר מוצרים

בורר מוצרים

חפשו ברשת מפיצים מאומתים עם יותר מ-15,000 נקודות מכירה ברחבי העולם.

קבלת הצעת מחיר

קבלת הצעת מחיר

התחילו את בקשת הקניה בצורה מקוונת ונציג מכירות ייצור עמכם קשר.

היכן לקנות?

היכן לקנות?

אתר בקלות את מפיץ Schneider Electric הקרוב ביותר אליך.

מרכז העזרה

מרכז העזרה

חפשו משאבי תמיכה לכל הצרכים שלכם במקום אחד.

  • תיעוד מוצרים
  • בורר המוצר
  • מוצרים חלופיים והחלפה
  • מרכז עזרה ויצירת קשר
  • איתור סניפי שניידר אלקטריק
  • היכן לקנות
  • הקהילה של Schneider Electric
  • משרות
  • פרופיל חברה
  • דיווח על התנהגות בלתי הולמת
  • נגישות
  • חדר חדשות
  • משקיעים
  • EcoStruxure
  • חיפוש משימה
  • בלוג
  • מדיניות שמירה על פרטיות
  • הודעה על קובצי Cookie
  • תנאי שימוש
  • Change your cookie settings