
CDS - three phase load-shedding contactor - 1 channel per phase
A9C15913
A9C15913 has not been replaced. Please contact your customer care centre for more information.
Prevents nuisance tripping of the upstream circuit breaker
Increases the number of loads without changing the installed power
Load shedding and restoration are performed separately for each phase, with one relay assigned per phase
Environmental Data
Environmental Data
Use Better
Packaging made with recycled cardboard
Recycled cardboard content is minimum 70% (50% in US). Some orders may include non-recycled cardboard until stock runs out.
No
Use Again
Take-back
Whether the product has been included in a global take-back program. Some products are eligible in some geographies, please verify if it's available in your country.
No