While connecting and sizing the non uniform busways follow the below steps in EcoStruxure Power Design - Ecodial
1. A rising busway has to be selected from the symbol pallet.
2. The busway can be calculated for uniform or non-uniform tap off unit’s distribution.
3. Set length of the non-uniform busway
4. When the busway is set to non-uniform distribution, the distance from origin must be set for each tap-off unit.
5. After calculation, for non-uniform busway, the short circuit currents and voltage drops are calculated for each feeder.
6. If the distance from origin of a feeder is more than the length of the BTS, after the calculation in the alarm window error will appear.
1. A rising busway has to be selected from the symbol pallet.
2. The busway can be calculated for uniform or non-uniform tap off unit’s distribution.
3. Set length of the non-uniform busway
4. When the busway is set to non-uniform distribution, the distance from origin must be set for each tap-off unit.
5. After calculation, for non-uniform busway, the short circuit currents and voltage drops are calculated for each feeder.
6. If the distance from origin of a feeder is more than the length of the BTS, after the calculation in the alarm window error will appear.
Released for: Schneider Electric New Zealand
Need help?
Product Selector
Quickly and easily find the right products and accessories for your applications.
Get a Quote
Start your sales inquiry online and an expert will connect with you.
Where to buy?
Easily find the nearest Schneider Electric distributor in your location.
Help Centre
Find support resources for all your needs, in one place.