Toyota Australia: Key Figures
14 buildings across 4 sites
Significant reduction in warehouse energy consumption
Eliminated equivalent to 1.8M metric kgs CO2 over substation lifetime by adopting AirSeT SF6‑free switchgear

Toyota’s Altona site in Melbourne has transformed from a manufacturing facility into a cutting-edge Centre of Excellence.
Toyota’s sustainability efforts through advanced building management systems and power monitoring solutions resulted in a significant reduction in warehouse energy use.
Collaboration with Schneider Electric has been crucial in achieving these milestones and ensuring Toyota’s facilities are future-ready. Watch the video to see how Toyota is driving the future of sustainable mobility.
Discover Schneider Electric solutions used by Toyota
SF₆ has a global warming potential (GWP) 23,500 times higher than CO₂. CO2 equivalent for SF6-free switchgear is based on a carbon offset calculation for a traditional switchgear that leaks 0.5 kg of SF₆/year over 30 years.