What could cause a M580 safety PLC safe task to come up in STOP mode after a power cycle?
Issue:
possible cause of M580 safety PLC safe task to come up in STOP mode after a power cycle
Product Line:
M580 Safety PLC, Ecostruxure Control Expert
Resolution:
One possible cause of the safety Task to come up in STOP mode is if the "support quantum remote drops" option in the processor configuration is selected and there is no Quantum drop configured in the project
Uncheck the "Support Quantum Remote drops" option in the processor configuration. This is would be an offline change and thus require a project download to the PLC.
Released for: Schneider Electric Thailand
Need help?
Product Selector
Quickly and easily find the right products and accessories for your applications.
Get a Quote
Start your sales inquiry online and an expert will connect with you.
Where to buy?
Easily find the nearest Schneider Electric distributor in your location.
Help Center
Find support resources for all your needs, in one place.