我們的品牌

Impact-Company-Logo-English Black-01-177x54

歡迎造訪施耐德電機全球網站

歡迎訪問我們的網站
		
我们今天能为您提供什么帮助?
Verifying meter's operation (ION 86xx)

This article shows how to verify the meter operation while connected to a circuit.

(1) Use the phasor diagram to verify the meters wiring as described in the meter's installation guide.
(2) Confirm nonzero readings for voltage and current readings according to the electrical service type.
(3) Verify the meter's event log for unusual events (201/246 DSP reset ION events).
(4) Verify the sag/swell count, if there is an abnormal count, the events should be investigated.

When the meter is connected to MV-90, the events and revenue log information can be read as described in the MV-90 and ION Technology technical note.

For further information please contact your local Technical Support Center.

施耐德電機Taiwan

  • 產品文檔
  • 軟體下載
  • 產品選型工具
  • 產品替代和替換
  • 幫助和聯絡中心
  • 尋找我們的辦公室
  • 取得報價
  • 施耐德電機社群
  • 人才招募
  • 公司簡介
  • 舉報不當行為
  • 無障礙
  • 新聞中心
  • 投資者
  • 專業洞察
  • 台灣施耐德電機學院
  • 綠色影響力落差調查
  • Schneider Go Green 2025
  • 隱私政策
  • Cookie通告
  • 使用條款
  • Change your cookie settings