我們的品牌

Impact-Company-Logo-English Black-01-177x54

歡迎造訪施耐德電機全球網站

歡迎訪問我們的網站
		
我们今天能为您提供什么帮助?
Where are I/O modules installed on a PM8000 meter

Issue
User wants to know where to install I/O modules on a PM8000 meter.

Product Line
PM8000 meters
METSEPM89M2600 (Digital I/O module)
METSEPM89M0024 (Analog I/O module)

Environment
I/O modules installation

Resolution
*Warning:  Installation and maintenance of this device should only be performed by qualified, competent personnel that have appropriate training and experience with high voltage and current devices. Failure to follow the instructions / warnings in the Meter Installation Guide can result in permanent damage to the meter, severe injury or death.

There are 2 methods to install I/O modules on a PM8000 meter. The method to choose will depend on your PM8000 model number

If meter is Panel mount meter with integrated display
I/O module to be installed on the back of the meter.
1) remove connector's cover on back of the meter
2) Make sure that connectors on meter and I/O module align with each other. Attach I/O module to the back of the meter.
3) secure the I/O module in its location by a 5mm (5/16 in) screw
4) reattach connector's cover that was removed in step 1 to the back of I/O module
See illustration below:
Screenshot of install guide for panel mount PM8000

If meter is DIN rail mount meter
I/O module to be installed on the side of the meter:
1) remove connector's cover from side of the meter
2) Hang the I/O module on your DIN rail
3) Secure I/O module to the DIN rail using Mounting clip.
4) Move I/O module using the DIN rail and attach it to the PM8000 meter> You should hear a click.
5) Secure the I/O module to the meter using a 5mm (5/16 in) screw.
6) reattach connector's cover that was removed in step 1 to the back of I/O module
See illustration below:

screenshot of install guide for Din mounted PM8000

施耐德電機Taiwan

探索更多
系列:
探索更多
系列:
  • 產品文檔
  • 軟體下載
  • 產品選型工具
  • 產品替代和替換
  • 幫助和聯絡中心
  • 尋找我們的辦公室
  • 取得報價
  • 施耐德電機社群
  • 人才招募
  • 公司簡介
  • 舉報不當行為
  • 無障礙
  • 新聞中心
  • 投資者
  • 專業洞察
  • 台灣施耐德電機學院
  • 綠色影響力落差調查
  • Schneider Go Green 2025
  • 隱私政策
  • Cookie通告
  • 使用條款
  • Change your cookie settings