我們的品牌

Impact-Company-Logo-English Black-01-177x54

歡迎造訪施耐德電機全球網站

歡迎訪問我們的網站
		
我们今天能为您提供什么帮助?
What is the pre-installation procedure for revenue meter PM8000 ?
Issue:
End user needs to revenue lock an PM8000 series meter and needs to what prerequisites are required to place the meter in the revenue lock state

Product:
PM8000 Series Meter

Environment:
Power Metering

Resolution:
You must configure and revenue lock your meter before installation.

• Clear all meter data prior to installing your revenue meter.
• Unlock your revenue meter.
• Configure the required revenue settings specific for installation. Once the meter
is locked, these settings cannot be changed.

• Verify the revenue settings have been implemented.
• Revenue lock your meter.
• Verify the meter is revenue-locked.
• Install the meter according to your meter’s install sheet.
• Install the voltage and current terminal covers according to the sealing kit
installation instructions.

For Instructions on how to revenue lock your PM8000 please check out FA317280


施耐德電機Taiwan

探索更多
系列:
探索更多
系列:

需要協助?

  • 產品選型工具

    快速輕鬆地為您的應用找到合適的產品和附件。

  • 取得報價

    立即線上提交您的銷售需求,專業團隊將主動聯繫您。

  • 購買地點

    輕鬆在您所在地區找到最近的施耐德電機經銷商。

  • 支援中心

    在同一位置找到滿足您所有需求的支援資源。

  • 產品文檔
  • 軟體下載
  • 產品選型工具
  • 產品替代和替換
  • 幫助和聯絡中心
  • 尋找我們的辦公室
  • 取得報價
  • 施耐德電機社群
  • 人才招募
  • 公司簡介
  • 舉報不當行為
  • 無障礙
  • 新聞中心
  • 投資者
  • 專業洞察
  • 台灣施耐德電機學院
  • 綠色影響力落差調查
  • Schneider Go Green 2025
  • 隱私政策
  • Cookie通告
  • 使用條款
  • Change your cookie settings