我們的品牌

Impact-Company-Logo-English Black-01-177x54

歡迎造訪施耐德電機全球網站

歡迎訪問我們的網站
		
我们今天能为您提供什么帮助?
How to connect the CT leads for an EMB and EME series meter?

Issue
How to connect the CT leads for an EMB and EME series meter?

Production Line
Energy Meter Basic model (EMB)
Energy Meter Extended Range model (EME)

Environment
Current Transformers

Cause
Connecting the CT leads to the terminals

Resolution

Attach the CT leads to appropriately colored CT input terminals, see CT wiring connection below depending on the installation application (3-phase, 4-wire; 1-phase, 3-wire; 1-phase, 2-wire):

  • red lead to red terminal
  • black lead to black terminal
  • yellow lead to black terminal

diagram of leads

Polarity is indicated, with the minus (-) terminals connected to neutral within the meter, but polarity is insignificant to the operation of the meter. Since the meter automatically detects phase reversal, so it is not necessary to orientate a particular side of the CTs toward the load.

See Energy Meter Instruction Bulletin, FA212755, for detailed installation instructions.

施耐德電機Taiwan

  • 產品文檔
  • 軟體下載
  • 產品選型工具
  • 產品替代和替換
  • 幫助和聯絡中心
  • 尋找我們的辦公室
  • 取得報價
  • 施耐德電機社群
  • 人才招募
  • 公司簡介
  • 舉報不當行為
  • 無障礙
  • 新聞中心
  • 投資者
  • 專業洞察
  • 台灣施耐德電機學院
  • 綠色影響力落差調查
  • Schneider Go Green 2025
  • 隱私政策
  • Cookie通告
  • 使用條款
  • Change your cookie settings