我们今天能为您提供什么帮助?

Can I add a delay in a script action in Vijeo Designer V6.2

There is no delay script method in Vijeo Designer.  It is not recommended to create a loop as a workaround since it can make the HMI very slow and effect the communication or even lock up the HMI
If you are calling the script from a switch , you can split your script in half and add a delay operation.  This delay operation is only available from a switch operation.  So if the script is called from a local or global action it cannot be done.

If this FAQ did not solve your issue, you can chat with us at chat with us or e-mail us at customer.services@se.com to create a case with our Technical Support Team.

If you are not located in North America, please contact your local Customer Care Center for assistance:
Support | Schneider Electric Global (se.com)

施耐德電機Taiwan

附件

探索更多

系列:

探索更多

系列:

需要協助?

產品選型工具

快速輕鬆地為您的應用找到合適的產品和附件。

取得報價

立即線上提交您的銷售需求,專業團隊將主動聯繫您。

購買地點

輕鬆在您所在地區找到最近的施耐德電機經銷商。

支援中心

在同一位置找到滿足您所有需求的支援資源。