我們的品牌

Impact-Company-Logo-English Black-01-177x54

歡迎造訪施耐德電機全球網站

歡迎訪問我們的網站
		
我们今天能为您提供什么帮助?
How to join together 2 Prisma P frameworks?
The Prisma P framework is delivered with the fixing elements necessary to join together two cubicles installed side by side.


It is recommended to choose the installation position of these elements based on the panels' configuration:
1. If horizontal busbars are installed at the top of the panel, then the 2 short screws have to be installed at the top and the 4 longer screws at the middle and bottom.
2. If horizontal busbars are installed at the bottom of the panel, then the 2 short screws have to be installed at the bottom and the 4 longer screws at the middle and top.
3. If horizontal busbars are not installed in the panel, then any of the 2 solutions above may be used.

The above instructions are meant to assure that the combination screws are not interfering with the installation of horizontal busbar supports or other mounting plates.

施耐德電機Taiwan

探索更多
系列:
探索更多
系列:

需要協助?

  • 產品選型工具

    快速輕鬆地為您的應用找到合適的產品和附件。

  • 取得報價

    立即線上提交您的銷售需求,專業團隊將主動聯繫您。

  • 購買地點

    輕鬆在您所在地區找到最近的施耐德電機經銷商。

  • 支援中心

    在同一位置找到滿足您所有需求的支援資源。

  • 產品文檔
  • 軟體下載
  • 產品選型工具
  • 產品替代和替換
  • 幫助和聯絡中心
  • 尋找我們的辦公室
  • 取得報價
  • 人才招募
  • 公司簡介
  • 舉報不當行為
  • 無障礙
  • 新聞中心
  • 投資者
  • 專業洞察
  • 台灣施耐德電機學院
  • 綠色影響力落差調查
  • Schneider Go Green 2025
  • 隱私政策
  • Cookie通告
  • 使用條款
  • Change your cookie settings