我们今天能为您提供什么帮助?

EcoStruxure Hybrid DCS [2019]:Topology Changes does not update the Control Project

Question

Why user is not able to update the Control Project from Topology Explorer?

1. Issue

In EcoStruxure Hybrid DCS 2019, Topology Explorer user can view and edit the Control Project parameters like IP Address, Sub mask Address etc. But the same when edited it not update the Control project that is defined inside Control Expert Window.

2. Product Line

This document is applicable for EcoStruxure Hybrid DCS 2019 only.

3. Resolution

In a normal scenario in Topology explorer user can view the Control Project Parameters like IP Address, Sub Mask address etc.
But the same is for only view only mode.
In EcoStruxure Hybrid DCS 2019 user can edit the parameters but the same will not be reflected inside the Control Project.
So even though it is in editable mode, user should not change the same.
Any parameter changes should be applied inside the Control Expert Window.

施耐德電機Taiwan

探索更多
系列:
探索更多
系列:

需要協助?

需要協助?

產品選型工具

產品選型工具

快速輕鬆地為您的應用找到合適的產品和附件。

取得報價

取得報價

立即線上提交您的銷售需求,專業團隊將主動聯繫您。

購買地點

購買地點

輕鬆在您所在地區找到最近的施耐德電機經銷商。

支援中心

支援中心

在同一位置找到滿足您所有需求的支援資源。

  • 產品文檔
  • 軟體下載
  • 產品選型工具
  • 產品替代和替換
  • 幫助和聯絡中心
  • 尋找我們的辦公室
  • 取得報價
  • 施耐德電機社群
  • 人才招募
  • 公司簡介
  • 舉報不當行為
  • 無障礙
  • 新聞中心
  • 投資者
  • 專業洞察
  • 台灣施耐德電機學院
  • 綠色影響力落差調查
  • Schneider Go Green 2025
  • 隱私政策
  • Cookie通告
  • 使用條款
  • Change your cookie settings