How to manage the control circuit wiring (to the backboard) since the product depth increases and control circuit connection is now much away to the backboard comparing to TeSys F ?
The wiring depends on the on-site situation. Generally, the wiring management shall be similar to the way which is being done with front mounted auxiliary contact blocks.
發佈於: 施耐德電機Taiwan


需要協助?
產品選型工具
快速輕鬆地為您的應用找到合適的產品和附件。
取得報價
立即線上提交您的銷售需求,專業團隊將主動聯繫您。
購買地點
輕鬆在您所在地區找到最近的施耐德電機經銷商。
支援中心
在同一位置找到滿足您所有需求的支援資源。