我們的品牌

Impact-Company-Logo-English Black-01-177x54

歡迎造訪施耐德電機全球網站

歡迎訪問我們的網站
		
我们今天能为您提供什么帮助?
Ecostruxure Process Expert[2021]: How to Set OPCUA Protocol for NUA module in Supervision Project
This document explains on How to set OPCUA  Protocol for NUA module in Supervision Project.

By default, when User creates an IO Device in Supervision project, OFSOPC protocol will be selected by the system. If User wants to communicate IO Device on OPCUA Protocol then he needs to configure the settings as mentioned below.

1. Open Board Properties in Communications settings of Services in Supervision Project as shown below.

Board

There will be two options for User which are OFSOPC & OPCUA. Set the Protocol as OPCUA and close as shown below.

protocol


2. Open IO Device's assigned Tag Container Properties of Supervision Project a shown below.

tagcontainer

There will be 3 options available for User which are OFSOPC, OPCUA & OPCUA EMBEDDED. If User is using NUA module, then he needs to select OPCUA Embedded in Protocol as shown below.

protcol

After Performing these settings, User can able to select the NUA module in Communication Mapping or else NUA module will not be visible for communication mapping. After that, complete the Communication mapping and then Perform Generate & Build. This completes the procedure for configuring OPCUA Protocol with NUA module in Supervision project.

施耐德電機Taiwan

探索更多
系列:
探索更多
系列:
  • 產品文檔
  • 軟體下載
  • 產品選型工具
  • 產品替代和替換
  • 幫助和聯絡中心
  • 尋找我們的辦公室
  • 取得報價
  • 施耐德電機社群
  • 人才招募
  • 公司簡介
  • 舉報不當行為
  • 無障礙
  • 新聞中心
  • 投資者
  • 專業洞察
  • 台灣施耐德電機學院
  • 綠色影響力落差調查
  • Schneider Go Green 2025
  • 隱私政策
  • Cookie通告
  • 使用條款
  • Change your cookie settings