Shipping Display Cover Removal for Newly Installed 5K and 6K SRT UPS Units
Procedure:
Shipping Display Cover Removal for Newly Installed 5K and 6K SRT UPS Units
Product:
APC by Schneider Electric SRT 5KVA and 6KVA units or UPS SKU numbers beginning with SRT5K or SRT6K - All regions
Solution:
An SRT 5K and 6K UPS will come with a metal cover for its screen upon unboxing.
The reason behind this is that the screen is attached directly to the battery door of the UPS and accidents can occur at first time installing the batteries if the UPS as the door can swing and make the screen bump and possibly cause permanent / physical damage. This is most common on SRT 5K and 6K UPS chassis.
In order to remove this cover, one must first locate 4 screws from the battery door and 1 from the metallic cover itself (to prevent it from swinging open). These screws will need to be removed.
Once the screws have been removed, the battery door can be slid to the left to be unlocked. After unlocking it, the battery door will be able to swing open which in turn can allow you to remove the screen metallic cover from being latched onto it.
If you have any clarifications and/or requests for the above-mentioned available information, please feel free to contact us at 1-800-800-4272 or chat with our technical support representatives.
發佈於: 施耐德電機Taiwan


需要協助?
產品選型工具
快速輕鬆地為您的應用找到合適的產品和附件。
取得報價
立即線上提交您的銷售需求,專業團隊將主動聯繫您。
購買地點
輕鬆在您所在地區找到最近的施耐德電機經銷商。
支援中心
在同一位置找到滿足您所有需求的支援資源。