我们今天能为您提供什么帮助?

How do I create a new project in EcoSet Config?

To create and design multiple switchboard, and to configure it , you must create a project. When a new project is created, you can develop multiple switchboards and configure each switchboard with required switchgears.

  1. Click Create a project.
  2. Enter your project name and update the basic information.
  3. Select the latest price list from the Applied price list drop down menu.
  4. Click Create.

Your new project is now created, and you can proceed to create a new switchboard.

The following tabs will appear in sequence.

Tabname

Function

MANAGESWITCHBOARD(A)

To manage multiple switchboards for a project.

SELECTAPRODUCT(B)

To create and manage switchboards.

SINGLE LINE DIAGRAM (C)

To generate and view the single line diagram.

DESIGN A SWITCHBOARD (D)

To select and manage switchboards.

BILLOFMATERIAL(E)

To generate bill of material for the final products.

EXPORT(F)

To export all project related documents in different document format like pdf, csv, jpg.

Manage Switchboards

new project

施耐德電機Taiwan

探索更多
系列:
探索更多
系列:

需要協助?

需要協助?

產品選型工具

產品選型工具

快速輕鬆地為您的應用找到合適的產品和附件。

取得報價

取得報價

立即線上提交您的銷售需求,專業團隊將主動聯繫您。

購買地點

購買地點

輕鬆在您所在地區找到最近的施耐德電機經銷商。

支援中心

支援中心

在同一位置找到滿足您所有需求的支援資源。

  • 產品文檔
  • 軟體下載
  • 產品選型工具
  • 產品替代和替換
  • 幫助和聯絡中心
  • 尋找我們的辦公室
  • 取得報價
  • 施耐德電機社群
  • 人才招募
  • 公司簡介
  • 舉報不當行為
  • 無障礙
  • 新聞中心
  • 投資者
  • 專業洞察
  • 台灣施耐德電機學院
  • 綠色影響力落差調查
  • Schneider Go Green 2025
  • 隱私政策
  • Cookie通告
  • 使用條款
  • Change your cookie settings