How to perform self-test on Back-UPS products?
Issue: Understanding the operation of the Back‑UPS self‑test and what happens during the test.
Product Line: Back‑UPS/Back-UPS Pro products
Cause: Users may need to test the battery inside the UPS to check battery condition.
Resolution:
By default, Back‑UPS units automatically perform a self‑test each time they are powered on to check battery condition and estimate runtime. During the self‑test, the UPS briefly switches to battery power for about 10 seconds, then returns to normal AC operation. For accurate results, the connected load should be between 10% and 30% of the UPS’s rated capacity, as lighter or heavier loads may lead to inaccurate runtime estimates.
For more details, see Back‑UPS Basic Self‑Test Theory Explained.
DISCLAIMER: If the self‑test is performed incorrectly or if unsupported methods are used, there is a risk of dropping the connected load.
1. Manual Self-Test
2. PowerChute Serial Shutdown (PCSS)
發佈於: 施耐德電機Taiwan
需要協助?
產品選型工具
快速輕鬆地為您的應用找到合適的產品和附件。
取得報價
立即線上提交您的銷售需求,專業團隊將主動聯繫您。
購買地點
輕鬆在您所在地區找到最近的施耐德電機經銷商。
支援中心
在同一位置找到滿足您所有需求的支援資源。