1) Enable Grid support in XW basic setup menu
2) Set Grid Support Voltage to 64V (32V for XW4024) and enable SELL in XW Advanced - Grid Support menu (only if firmware on the XW inverter/charger is 1.07)
3) Verify XW CHARGE CYCLE is '2Stg/NoFloat' in XW Advanced - Charger Settings - Charge Cycle (factory default setting)
4) On MPPT set CHARGE CYCLE to '3 stage' in MPPT Advanced - Charger Settings - Charge Cycle
5) It is also recommended that the system has a minimum battery capacity of 200Ah. An additional 100Ah for every 1kW of solar power is preferable.
3) Verify XW CHARGE CYCLE is '2Stg/NoFloat' in XW Advanced - Charger Settings - Charge Cycle (factory default setting)
4) On MPPT set CHARGE CYCLE to '3 stage' in MPPT Advanced - Charger Settings - Charge Cycle
5) It is also recommended that the system has a minimum battery capacity of 200Ah. An additional 100Ah for every 1kW of solar power is preferable.
Released for: Schneider Electric USA
Need help?
Product Selector
Quickly and easily find the right products and accessories for your applications.
Get a Quote
Start your sales inquiry online and an expert will connect with you.
Where to buy?
Easily find the nearest Schneider Electric distributor in your location.
Help Center
Find support resources for all your needs, in one place.