{"searchBar":{"inputPlaceholder":"Search by keyword or ask a question","searchBtn":"Search","error":"Please enter a keyword to search"}}
{}

Welcome to the Schneider Electric Website

Welcome to our website.

Select your location

Welcome the the Schneider Electric French website. It looks like you are located in the United States, would you like to change your location?

Traduisez en francais
{"support":{"yesButton":"Yes","noButton":"No","feedback":{"title":"What can we do to improve?"},"submitButton":"Submit","successMessage":"Thank you for your feedback","title":"Was this helpful?","feedbackPercentLabel":"of people found this helpful","captcha":{"error":"Please check the box"}}}
Search FAQs

What is the pre-installation procedure for revenue meter PM8000 ?

Issue:
End user needs to revenue lock an PM8000 series meter and needs to what prerequisites are required to place the meter in the revenue lock state

Product:
PM8000 Series Meter

Environment:
Power Metering
 
Resolution:
You must configure and revenue lock your meter before installation.

• Clear all meter data prior to installing your revenue meter.
• Unlock your revenue meter.
• Configure the required revenue settings specific for installation. Once the meter
  is locked, these settings cannot be changed.

• Verify the revenue settings have been implemented.
• Revenue lock your meter.
• Verify the meter is revenue-locked.
• Install the meter according to your meter’s install sheet.
• Install the voltage and current terminal covers according to the sealing kit
  installation instructions.


For Instructions on how to revenue lock your PM8000 please check out FA317280
 

 
Explore more
Explore more