You are currently viewing the content available in Vietnam. If you are looking for information for another region, please select the correct country from the top-left dropdown in the page and 'Navigate to Browse FAQs' in the Support menu.
Issue:
How long does it take an ATV630 to accept a run command after receiving line voltage?
Product Line:
Altivar Machines, Altivar 630
Environment:
All models and serial numbers
Cause:
Application design
Resolution:
Once line voltage is switched on, the ATV630 can accept a run command and start drawing current in 3 seconds.
If any further detail is needed, please contact Schneider Electric Drive Product Support Group.
How long does it take an ATV630 to accept a run command after receiving line voltage?
Product Line:
Altivar Machines, Altivar 630
Environment:
All models and serial numbers
Cause:
Application design
Resolution:
Once line voltage is switched on, the ATV630 can accept a run command and start drawing current in 3 seconds.
If any further detail is needed, please contact Schneider Electric Drive Product Support Group.