Our Brands

Welcome to the Schneider Electric Website

Welcome to our website.
		
How can we help you today?
You are currently viewing the content available in Vietnam. If you are looking for information for another region, please select the correct country from the top-left dropdown in the page and 'Navigate to Browse FAQs' in the Support menu.
Masterpact MTZ: Components needed to locally operate breaker via smartphone app

Issue: Local operation via phone app capability was not ordered from the factory.  Need to field modify.
Product Line: Circuit Breakers
Environment: Masterpact MTZ

Resolution: to field modify, the following components are required. Some of these parts may already be installed.

  • Mobile App – EcoStruxure Power Device
  • Masterpact Operation Assistant Digital Module LV850005
  • XF-Com, MX-Com coils, part numbers vary based on voltage.
  • Spring Charging Motor, part numbers vary based on voltage.
  • Isolation Module LV850056SP

Isolation module

  • Isolation Module to coils communication cables MTZ1: LV833118SP, MTZ2/MTZ3: LV847904SP

isolation module to coil cables

  • MX-Com cable needs to be plugged into the MX1 location on Isolation module, not MX2.

Isolation module MX1 wiring location

  • Coils properly wired, C3 and A3 continuously powered. C2 and A2 are only needed for push button operation.

coil wiring diagram

  • Accessories Declared in the Control Unit via EPC, click the accessory pencil

edit breaker accessories


Then declare accessories
declare accessories

Schneider Electric Vietnam

You are currently viewing the content available in Vietnam. If you are looking for information for another region, please select the correct country from the top-left dropdown in the page and 'Navigate to Browse FAQs' in the Support menu.
Masterpact MTZ: Components needed to locally operate breaker via smartphone app

Issue: Local operation via phone app capability was not ordered from the factory.  Need to field modify.
Product Line: Circuit Breakers
Environment: Masterpact MTZ

Resolution: to field modify, the following components are required. Some of these parts may already be installed.

  • Mobile App – EcoStruxure Power Device
  • Masterpact Operation Assistant Digital Module LV850005
  • XF-Com, MX-Com coils, part numbers vary based on voltage.
  • Spring Charging Motor, part numbers vary based on voltage.
  • Isolation Module LV850056SP

Isolation module

  • Isolation Module to coils communication cables MTZ1: LV833118SP, MTZ2/MTZ3: LV847904SP

isolation module to coil cables

  • MX-Com cable needs to be plugged into the MX1 location on Isolation module, not MX2.

Isolation module MX1 wiring location

  • Coils properly wired, C3 and A3 continuously powered. C2 and A2 are only needed for push button operation.

coil wiring diagram

  • Accessories Declared in the Control Unit via EPC, click the accessory pencil

edit breaker accessories 


Then declare accessories
declare accessories 
 

Schneider Electric Vietnam

Explore more
Range:
Explore more
Range:
Users group

Discuss this topic with experts

Visit our community and get advice from experts and peers on this topic and more
Users group

Discuss this topic with experts

Visit our community and get advice from experts and peers on this topic and more
Explore more
Range:
Explore more
Range:

Need help?

  • Start here!

    Find answers now. Search for a solution on your own, or connect with one of our experts.

  • Contact Support

    Reach out to our customer care team to receive more information, technical support, assistance with complaints and more.

  • Where to buy?

    Easily find the nearest Schneider Electric distributor in your location.

  • Search FAQs

    Search topic-related frequently asked questions to find answers you need.

  • Contact Sales

    Start your sales inquiry online and an expert will connect with you.

I'd like to receive news and commercial info from Schneider Electric and its affiliates via electronic communication means such as email, and I agree to the collection of information on the opening and clicks on these emails (using invisible pixels in the images), to measure performance of our communications and improve them. For more details, please read our Privacy Policy.

  • Products Documentation
  • Software Downloads
  • Product Selector
  • Product Substitution and Replacement
  • Help and Contact Center
  • Find our Offices
  • Get a Quote
  • Where to buy
  • Company Profile
  • Report a misconduct
  • Accessibility
  • Investors
  • EcoStruxure
  • Job Search
  • Blog
  • Privacy Policy
  • Cookie Notice
  • Terms of use
  • Change your cookie settings
Your browser is out of date and has known security issues.

It also may not display all features of this website or other websites.

Please upgrade your browser to access all of the features of this website.

Latest version for Google Chrome, Mozilla Firefox or Microsoft Edgeis recommended for optimal functionality.