Hoe kunnen wij u vandaag helpen?
EcoStruxure Process Expert: How to remove the warning in simulation control project
This Knowledge base explains the steps to be followed for resolving the warning message popups when the control project is build in simulation mode(when station node is assigned in executable)
The user will be getting the below warning message when he performs the same.
The issue is happening as the ethernet security of EIO bus was not configured as per the requirement.The following steps are needed to be performed to unlock the security of EIO bus in the project
1. Refine the Build project
2. Navigate to the EIO bus configuration as shown below
3. Navigate to the "Security" tab and click on "Unlock Security"
4. Save the refine changes
5. Build the project again.
Gepubliceerd voor: Schneider Electric Belgium
Ontdek meer
Productfamilie
Ontdek meer
Productfamilie
Hulp nodig?
Selecteer zelf het juiste product
Vind snel en eenvoudig de juiste producten en toebehoren voor uw toepassingen.
Offerte aanvragen
Dien uw aanvraag online in en een expert zal contact met u opnemen.
Verkooppunten
Vind eenvoudig de dichtstbijzijnde distributeur van Schneider Electric op uw locatie.
Help Center
Vind de antwoorden die u nodig heeft via bladeren door veelgestelde vragen over onderwerpen.