{}

Our Brands

Impact-Company-Logo-English Black-01-177x54

Welcome to the Schneider Electric Website

Welcome to our website.
Search FAQs
How can a SDSA1175 be installed into a load center?
Issue:
Installation of SPD into load centers.

Product Line:
Load centers and Surge Protection Devices

Environment:
SDSA, QO, HOM

Resolution:
The recommended installation of the SDSA1175 is to be connected to a 2-pole 20A branch circuit breaker (installed as close as possible to the main lugs or main breaker). The other way this device can be installed is by direct buss connecting it in a Square D QO or Homeline load centers using a QOSAMK mounting kit. This kit also includes hardware to connect the SDSA1175 leads to the load side of the main circuit breaker.


Schneider Electric Canada

Explore more
Range:
Articles that might be helpful Users group

Discuss this topic with experts

Visit our Community for first-hand insights from experts and peers on this topic and more.
Explore more
Range: