Issue:
When installing QED Switchboards, what clearances need to be observed ?
Product Line:
QED Switchboards
Environment:
Installation
Cause:
Permitted distance
Resolution:
Minimum clearances for SWBD installation are determined by the NEC and CEC Codes. Consult section 110-25 in the NEC and section 2-308, part 1 of the CEC for further details.
When installing QED Switchboards, what clearances need to be observed ?
Product Line:
QED Switchboards
Environment:
Installation
Cause:
Permitted distance
Resolution:
Minimum clearances for SWBD installation are determined by the NEC and CEC Codes. Consult section 110-25 in the NEC and section 2-308, part 1 of the CEC for further details.