{}

Our Brands

Impact-Company-Logo-English Black-01-177x54

Welcome to the Schneider Electric Website

Welcome to our website.
Search FAQs
Video: How to install the LV426963 3 pole terminal nut kit onto a PowerPacT B frame
Issue:
How do you install the three pole terminal nut kit (LV426963) onto a PowerPacT B-frame circuit breaker?

Product Line:
Molded Case Circuit Breakers

Resolution:
Remove the green connection system cover (put a screwdriver or similar flat tool into slot in the connecter and push out) and the currently installed lug kit (put a screwdriver or similar flat tool into the gap between the lug kit and breaker on the back, and push the lug kit out). Place the notches on the terminal nut kit into the grooves in the back of the breaker, and then press down until it clicks into place. Then use the screws provided with the kit to tighten down the conductors to the kit. Then reinstall the green connection system cover and place the provided labels on the side or front face of the breaker over the previous lug information. For more information, see the video below or the attached instruction bulletin:

Schneider Electric Canada

Attachment(s)
B Frame Mechanical Lugs, Everlink Lugs, and Terminal Nut Connectors.pdf [4.87 MB]
Explore more
Range:
Articles that might be helpful Users group

Discuss this topic with experts

Visit our Community for first-hand insights from experts and peers on this topic and more.
Explore more
Range: